The Staging construction has begun

I managed to squeeze a bit of work tonight, a small, baby step, towards the Staging level.

The track extends all around to where the helix area begins.

Still deciding whether to complete the peninsula wall and start work on it, or build the wall between the support columns. I fear that if I do the peninsula wall I wouldn’t be able to move materials around the room. Those metal studs and tracks are all 10 ft. long so I’d be fishing them through the space between the wall studs.

I also need to complete this benchwork drawing with the missing bits and pieces…The big space in the upper left corner is where the oval helix is going to be, although there will be a hole in the middle of that area so that helix can be cleaned from the inside.