Staging Subroadbed Completed
It was a long way to here. In retrospect, have I known that it would’ve been this much work, I might have opted for some other hobby. Bah, who am I kidding…
Exploring the World of Model Railroading
It was a long way to here. In retrospect, have I known that it would’ve been this much work, I might have opted for some other hobby. Bah, who am I kidding…
I’m one of those people with a beautiful hardwood floor in a finished basement that’s totally uneven and a disaster to level on. To illustrate my point, on the left, top surface is measured at the back of the layout room where ceiling is the lowest (and this is my reference height), and on the right measured at the blob around the column.
Gods of weather smiled upon me this morning by granting me couple of hours before rain, just enough to finish the peninsula blob and fill the gaps that were remaining from yesterday. The benchwork now looks ready to receive the roadbed and track…
Another productive weekend and although I did not get to finish everything, most of the subroadbed has been cut and fitted on the lower level. I did not get to cut the peninsula blob as I ran out of time.