Tag: Newbridge & Lockport RR

Leave a reply

Peninsula backdrop surface installed and spackled

OK, so it’s half of the peninsula – the part that’s built. I’m glad I did not build the whole thing because there would be no room to do any work with these big sheets of hardboard. Serendipity strikes again!

(more…)


Leave a reply

North wall backdrop surfaces installed

During the week I squeezed in some time to prime the hardboard (two coats) for the backdrops, looking towards the weekend for their installation. Well, the plan worked out and the backdrop surfaces have now been installed.

(more…)


Leave a reply

Test-fitting backdrops

This winter is really getting under my skin with long stretches of very cold days, where all you can do is hide inside where it’s warm. It definitely does not help with building a layout when one needs materials from outside, or has to do cutting and what not.

Today ended up being somewhat warmer at -5 C, from our -15 C norm that we have been having past couple of weeks. It gave me an opportunity to run over to my local home despot and finally buy some hardboard for the backdrops. Hooray, the space is transforming, once again, although it does look even more closed up now.

(more…)


Leave a reply

Another small step done

Managed to build the North West curve that I haven’t had a chance to finish yesterday…

(more…)


Leave a reply

More changes on New Year’s Day..

Today marks the end of the railroad building marathon session which started two weeks ago. It’s back to work tomorrow, boohoo. But before that, more progress has been made on the peninsula, which is finally taking shape.

(more…)


Leave a reply

South wall Staging framework completed

Past two days were so-so productive, or maybe I just expect too much. At first, it took a long time to derive a satisfactory cross-brace design. After that it was a matter of fabrication, measuring and cutting metal studs and track to size, fitting, measuring more, levelling everything. Did I mention levelling and measuring?

(more…)


Leave a reply

Layout construction schedule

Note: This is a living document. It will change as often as this railroad is tweaked and tuned.
Last modified on Mar 29, 2019 @ 11:17 pm

This page will serve as a schedule plan for the Newbridge & Lockport RR layout construction. The intent is to obviously build this layout in phases and reaching milestones at whatever intervals possible (the sooner the better), while not having long inactive periods, unless there’s a good reason for it.

(more…)